融合规则的HEDA求解带工件批量运输的三阶段装配集成调度问题
作者:
作者单位:

(1. 昆明理工大学机电工程学院,昆明650500;2. 昆明理工大学信息与自动化学院,昆明650500;3. 清华大学自动化系,北京100084)

作者简介:

通讯作者:

E-mail: bin.qian@vip.163.com.

中图分类号:

TP391

基金项目:

国家自然科学基金项目(51665025, 61963022, 61873328).


Rule-based hybrid EDA for three-stage assembly integrated scheduling problem with job batches transportation
Author:
Affiliation:

(1. School of Mechanical and Electronic Engineering,Kunming University of Science and Technology,Kunming 650500,China;2. School of Information Engineering and Automation,Kunming University of Science and Technology,Kunming650500,China;3. Department of Automation,Tsinghua University,Beijing100084,China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对现有三阶段装配集成调度问题模型将各工件在运输阶段的运输时间简化设定为相同常量,未考虑运输车辆数量和车载重量有限会导致工件需按批量分别运输的实际情况,研究以最小化总完工时间为目标的带工件批量运输的加工、运输、装配三阶段装配集成调度问题(three-stage assembly integrated scheduling problem with job batch transportation,3sAISP_JBT)和求解算法.首先,分阶段建立3sAISP_JBT的数学模型;其次,分别提出求解运输、装配阶段对应子问题的先完工先运输(first completed first transported,FCFT)规则和先到先装配(first come first assembly,FCFA)规则,以降低求解3sAISP_JBT的整体计算复杂度;再次,提出一种融合多种规则的混合分布估计算法(hybrid estimation of distribution algorithm with rules,HEDA_R)求解3sAISP_JBT;最后,通过仿真实验和算法比较验证了所提出算法的有效性.

    Abstract:

    In the existing research on the three-stage assembly integrated scheduling problem model, the transportation time of each job is simplified to the same constant at the transportation stage. In practical situations, however, jobs are supposed to be transported separately in batches, due to the limitation of the number and the load capacity of transport vehicles. This paper studies the three-stage assembly integrated scheduling problem with job batches transportation (3sAISP_JBT) and the corresponding algorithm. The criterion of 3sAISP_JBT is to minimize the maximum completion time. Firstly, a mathematical model of 3sAISP_JBT is formulated in stages. Secondly, in order to reduce the overall computational complexity of solving 3sAISP_JBT, the first completed first transported(FCFT) rule and the first come first assembly(FCFA) rule are proposed for the sub-problems in the transportation and assembly stages, respectively. Thirdly, a hybrid estimation of distribution algorithm with rules(hybrid estimation of distribution algorithm with rules,HEDA_R) is proposed to solve 3sAISP_JBT. Finally, simulation experiments and algorithm comparisons verify the effectiveness of the proposed algorithms.

    参考文献
    相似文献
    引证文献
引用本文

邓超,钱斌,胡蓉,等.融合规则的HEDA求解带工件批量运输的三阶段装配集成调度问题[J].控制与决策,2020,35(10):2507-2513

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2020-08-28
  • 出版日期: