资源约束项目调度研究综述
DOI:
CSTR:
作者:
作者单位:

清华大学自动化系

作者简介:

王凌

通讯作者:

中图分类号:

TP18

基金项目:

;国家自然科学基金项目


Survey on resource-constrained project scheduling
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    资源约束项目调度问题(RCPSP) 研究资源的合理利用和项目活动的合理调度, 实现既定目标的最优化, 具有很强的工程背景, 近年来得到了学术界和工业界的广泛关注. 为此, 介绍了RCPSP 的数学模型以及多种问题的扩充, 总结了相关理论, 重点综述了RCPSP 的算法, 并归纳了若干应用进展. 最后指出了有待进一步研究的方向和内容.

    Abstract:

    Resource-constrained project scheduling problem (RCPSP) is to study the reasonable utilization of resource and
    scheduling of project activities to optimize certain objectives, which is of strong engineering background, and has gained wide research in both academic and industrial fields. The mathematical model of RCPSP and its various generalizations are introduced, the related theoretical work is summarized, the research on the algorithms for RCPSP is surveyed, and several applications are reviewed. Finally, some further research direction and issues are proposed.

    参考文献
    相似文献
    引证文献
引用本文

方晨 王凌.资源约束项目调度研究综述[J].控制与决策,2010,25(5):641-650

复制
相关视频

分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2009-05-11
  • 最后修改日期:2009-06-23
  • 录用日期:
  • 在线发布日期: 2010-05-20
  • 出版日期:
文章二维码