零等待约束下多产品间歇过程的多目标调度
CSTR:
作者:
作者单位:

(1.鲁东大学信息与电气工程学院,山东烟台264025;2.吉林大学交通学院,长春130022;3.华东理工大学化工过程先进控制和优化技术教育部重点实验室,上海200237)

作者简介:

邓冠龙(1985-), 男, 讲师, 从事生产计划与调度、智能优化算法等研究;顾幸生(1960-), 男, 教授, 博士生导师, 从事生产计划与调度、复杂工业过程建模、控制和优化等研究.

通讯作者:

E-mail: dglag@163.com

中图分类号:

TP273

基金项目:

国家自然科学基金项目(61403180, 51405075, 61573144).


Multi-objective scheduling for multi-product batch process with no-wait constraint
Author:
Affiliation:

(1.School of Information and Electrical Engineering,Ludong University,Yantai264025,China;2.Transportation College,Jilin University,Changchun130022,China;3.Key Laboratory of Advanced Control and Optimization for Chemical Processes,Ministry of Education,East China University of Science and Technology,Shanghai200237,China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对零等待约束下多产品间歇过程的总流程时间和完工时间最小化问题,提出一种多目标离散组搜索算法求解.在采用启发式规则产生初始解的基础上,通过发现者、追随者和巡逻者的操作设计,算法不断更新Pareto前沿,同时,混合了基于插入邻域的多目标局部搜索方法.大量计算实验表明,所提出的算法获得的非支配解集在IGD和Set Coverage指标上优于非支配排序遗传算法和模拟退火算法,可为多目标决策者提供更好的决策依据,利于间歇生产过程的优化运行.

    Abstract:

    The multi-objective scheduling problem for the multi-product batch process with no-wait constraint is considered with makespan and total flow time minimizations, and a multi-objective discrete group search optimizer is proposed. The algorithm employs a well-known heuristic to generate initial solutions, and updates a non-dominated solution set by operators of producers, scroungers and rangers.Besides, an insertion-based local search procedure is hybridized. A bunch of computational experiments reveal that the proposed algorithm yields a non-dominated solution set with better IGD and Set Coverage values than the non-dominated sorting genetic algorithm and the bi-objective multi-start simulated annealing algorithm. It is also shown that, the algorithm can provide better basis for multi-objective decision-makers, which benefits the operation optimization of batch process production.

    参考文献
    相似文献
    引证文献
引用本文

邓冠龙,田广东,顾幸生.零等待约束下多产品间歇过程的多目标调度[J].控制与决策,2017,32(3):474-480

复制
相关视频

分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2017-03-10
  • 出版日期:
文章二维码