动车组长周期多年度高级修计划一体化优化方法
CSTR:
作者:
作者单位:

1.北京交通大学;2.中国铁路济南局集团有限公司;3.中车青岛四方机车车辆股份有限公司

作者简介:

通讯作者:

中图分类号:

U292.4

基金项目:

国家自然科学基金项目(面上项目,重点项目,重大项目)


Integrated Optimization Method for Long Cycle Multi-Year High-Level Maintenance Plan of Train-Sets
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    长周期高级修计划是铁路局安排动车组运用和检修单位配置资源的重要依据。既有长周期高级修计划主要依靠人工经验编制,存在编制耗时长、动车组里程利用不充分等问题。为此,本文提出动车组长周期多年度高级修计划一体化编制方法,将动车组在未来五年规划期内的多次高级修送修时间统一纳入决策,综合考虑检修周期、检修能力、各客流时期用车需求、资金预算及日均里程控制等约束,以高级修总损失里程最小为目标,建立混合整数规划模型。设计自适应大规模邻域搜索算法求解模型,提出两阶段贪婪算法生成初始解,并构造5个破坏算子和4个修复算子提升搜索效率。以济南铁路局202列动车组2025-2029年高级修计划为案例进行验证。结果表明:一体化优化方案的总损失里程较分阶段优化方案降低10.60%,较人工方案降低75.2%。本文所提方法能够有效提升长周期高级修计划编制质量,为铁路局多年度高级修任务统筹安排和检修资源配置提供决策支持。

    Abstract:

    Long-cycle high-level maintenance plans serve as an important basis for railway administrations to arrange train-set operation and for maintenance units to allocate resources. Existing long-cycle high-level maintenance plans are mainly prepared based on manual experience, which may lead to time-consuming planning and insufficient utilization of train-set mileage. To address these issues, this paper proposes an integrated planning method for long-cycle multi-year high-level maintenance plans of train-sets. The method incorporates multiple high-level maintenance starting times of train-sets within a five-year planning horizon into a unified decision-making framework. A mixed-integer programming model is formulated with the objective of minimizing total mileage loss, while comprehensively considering maintenance cycle constraints, maintenance capacity constraints, train-set availability requirements during different passenger-flow periods, capital budget constraints, and daily mileage control constraints. To solve the model, an adaptive large neighborhood search (ALNS) algorithm is designed. A two-phase greedy algorithm is proposed to generate the initial solution, and five destroy operators and four repair operators are constructed to improve search efficiency. A case study is conducted using the 2025-2029 high-level maintenance plan for 202 train-sets under the Jinan railway administration. The results show that the total mileage loss of the integrated optimization scheme is reduced by 10.60% compared with the phased optimization method and by 75.2% compared with the manual plan. The proposed method can effectively improve the quality of long-cycle high-level maintenance planning and provide decision support for railway administrations in coordinating multi-year high-level maintenance tasks and allocating maintenance resources.

    参考文献
    相似文献
    引证文献
引用本文
相关视频

分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2026-06-17
  • 最后修改日期:2026-09-11
  • 录用日期:2026-09-15
  • 在线发布日期: 2026-10-13
  • 出版日期:
文章二维码