Abstract:Long-cycle high-level maintenance plans serve as an important basis for railway administrations to arrange train-set operation and for maintenance units to allocate resources. Existing long-cycle high-level maintenance plans are mainly prepared based on manual experience, which may lead to time-consuming planning and insufficient utilization of train-set mileage. To address these issues, this paper proposes an integrated planning method for long-cycle multi-year high-level maintenance plans of train-sets. The method incorporates multiple high-level maintenance starting times of train-sets within a five-year planning horizon into a unified decision-making framework. A mixed-integer programming model is formulated with the objective of minimizing total mileage loss, while comprehensively considering maintenance cycle constraints, maintenance capacity constraints, train-set availability requirements during different passenger-flow periods, capital budget constraints, and daily mileage control constraints. To solve the model, an adaptive large neighborhood search (ALNS) algorithm is designed. A two-phase greedy algorithm is proposed to generate the initial solution, and five destroy operators and four repair operators are constructed to improve search efficiency. A case study is conducted using the 2025-2029 high-level maintenance plan for 202 train-sets under the Jinan railway administration. The results show that the total mileage loss of the integrated optimization scheme is reduced by 10.60% compared with the phased optimization method and by 75.2% compared with the manual plan. The proposed method can effectively improve the quality of long-cycle high-level maintenance planning and provide decision support for railway administrations in coordinating multi-year high-level maintenance tasks and allocating maintenance resources.